A routine airline trip is transformed into something quite special courtesy of NASA.
A routine airline trip is transformed into something quite special courtesy of NASA.
Astrogenetix PR — NASA astronauts onboard Space Shuttle Discovery’s final mission to the International Space Station (ISS) will carry out the eleventh scientific payload for Astrogenetix, a commercial biotech company based out of Austin, Texas. The research on STS-133 will focus on changes that occur to methicillin-resistant Staphylococcus aureus (MRSA) in microgravity, which can be targeted to create new vaccines and therapeutics.
NASA PR — Space shuttle Discovery docked to the International Space Station at 2:14 p.m. EST Saturday with its cargo of a new station module, equipment and supplies for the orbiting laboratory.
(more…)
We’ve got a busy couple of weeks ahead in terms of American launches. The schedule: Glory Date: Wednesday, Feb. 23 Time: 5:09 a.m. EST Location: Vandenberg Air Force Base, Calif. Coverage: https://www.nasa.gov/ntv (3:30 a.m. EST start) NASA’s Glory mission will allow scientists to better understand how the sun and tiny atmospheric particles called aerosols affect Earth’s climate. Both aerosols and solar energy influence the planet’s energy budget – the amount […]
NASA MISSION UPDATE Space shuttle Discovery remains in the Vehicle Assembly Building (VAB) as modifications and repairs are made to the external fuel tank’s support beams known as “stringers.” Additional support structures called radius blocks are being added to 95 stringers, meaning the entire circumference of the external tank will be strengthened by the time all the repairs and modifications are finished. “It’s been a long road,” said John Shannon, […]
NASA PROGRAM UPDATE Jan. 3, 2010 Space shuttle Discovery remains inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, where technicians today are starting repairs on three support beams, called stringers, on the outside of the shuttle’s external tank. Recent X-ray type image scans of all 108 of the tank’s stringers revealed four small cracks on three beams on the side opposite Discovery. Managers decided Thursday to […]
NASA MISSION UPDATE
NASA managers have targeted space shuttle Discovery’s launch for no earlier than Feb. 3 at 1:34 a.m. EST. Shuttle managers determined more tests and analysis are needed before proceeding with the launch of the STS-133 mission to the International Space Station.
The Program Requirements Control Board met Thursday and reviewed engineering evaluations associated with cracks on two 21-foot-long, U-shaped aluminum brackets, called stringers, on the shuttle’s external tank. NASA repaired the cracks and reapplied foam to the exterior of the stringers.
NASA MISSION UPDATE NASA managers have targeted space shuttle Discovery’s launch for no earlier than Dec. 17. Shuttle managers determined more tests and analysis are needed before proceeding with the STS-133 mission. The launch status meeting planned for Monday, Nov. 29, has been postponed and will be rescheduled. The Program Requirements Control Board reviewed on Wednesday repairs and engineering evaluations associated with cracks on two 21-foot-long, U-shaped aluminum brackets, called […]
NASA MISSION UPDATE Nov. 19, 2010 At yesterday’s Program Requirements Control Board, or PRCB, the Space Shuttle Program clearly identified the analysis and repairs that are required to safely launch shuttle Discovery on its STS-133 mission. This analysis will be reviewed at a special PRCB on Wednesday, Nov. 24. Pending a successful review of the flight rationale at that meeting, a Launch Status Briefing would be held with senior NASA […]