Masten Completes First Leg of Lunar Lander Challenge
Masten Space Systems has just completed the first leg of its Northrop Grumman Lunar Lander Challenge flight in Mojave, Calif. The flight time was 3:02 – two seconds over the required time. Masten engineers are now preparing the Xoie vehicle for the required return flight. The unofficial landing accuracy is 28 centimeters.
Leave a Reply
You must be logged in to post a comment.